espa

Deliverable 1.3


Scaling strategy of the innovative PBR system and transition from discontinuous / semi-continuous to continuous operation.

29.09.20 - 28.09.23

The technical report will include the results from experimental studies regarding the design and the possibility of continuous operation of the innovative PBR. In addition, based on the deliverables D1.1 & D1.2, the strategy of scaling the operating profile of the laboratory-scale PBR to the respective pilot scale will be developed by the UTH and VERD and the effectiveness of this strategy will be evaluated.